2021/06/30 |
|
PCN(Product Change Notice)
|
Several changes affecting Gen5N Mosfets for DSO8 package : PROCESS Old New - chip backside metallization Cr/Ni/Ag Sputter Process Ti/Ni/Ag Evaporation Process - chip frontside metallization Al/Si Al/Si/Cu - WAFER PRODUCTION fab Infineon Technologies EPISIL Technologies Inc. Americas Corp.,Temecula, United States - ASSEMBLY:marking Site location code"C" Site location code"/P" - ASSEMBLY:assembly Carsem (M) Sdn.Bhd. Carsem (M) Sdn.Bhd. and Amkor Technology Malaysia Sdn Bhd |
2021/08/15 |
|
PCN(Product Change Notice)
|
Harmonize and standardize the lot number format across all external production partners Old : Multiple lot number formats New : Standardized into a single 11 alphanumeric lot number format |
2022/08/19 |
|
PCN(Product Change Notice)
|
Standardization of lot number format Old: Multiple lot number formats New: Standardized into a single 11 alphanumeric lot number format Intended start of delivery : 2022-08-19
Note: Customers may receive both current and new lot number formats, in same packing material, as all existing inventory cannot be re-labeled |
2022/11/07 |
|
PDN(Product Discontinuation Notice)
|
Product discontinuation |
2022/11/07 |
|
PDN(Product Discontinuation Notice)
|
Product discontinuation - updated information |