2021/06/01 |
|
PCN(Product Change Notice)
|
Module date codes have been migrated from their current 5-digit date code to a 6-digit date code format. The date-code format will be updated on the individual module laser marking, the individual unit labeling, and the shipping documentation. Six-digit (6-digit) date code will follow the following format: HAYYWW, where the first two characters (HA) are internal identifiers, YY (the third and fourth characters) represent the year, and WW (the fifth and sixth characters) represent the week. |
2021/11/11 |
|
PCN(Product Change Notice)
|
Module Label Change on the FM3 Platform Description of the Change Module in the FM3 platform will be updated with Wolfspeed Wolfpack(T). The new laser marking defines (1) information placement, (2) addition of the product naming WOLFSPEED WOLFPACK, and (3) enlargement of the part number and SN across the whole bottom of the text area Effective Date: 11/11/21 |
2022/07/01 |
|
PCN(Product Change Notice)
|
Manufacturing of Power Modules on 200-mm Wafers at the Mohawk Valley Fabrication (MVF) Facility
Description of the Change Wolfspeed’s silicon carbide (SiC) power modules are currently manufactured on 150-mm wafers at Wolfspeed’s fabrication facilities in RTP and Durham, North Carolina, USA. To increase its production capacity, Wolfspeed will utilize its state-of-the art 200-mm wafer Mohawk Valley Fabrication (MVF) facility in New York.
Estimated Key PCN Dates. Volume Production Date Beginning July 2022 |
2025/03/28 |
|
PCN(Product Change Notice)
|
Align test and datasheet limits across all gen3 1200V Wolfpack modules
|