Chip One Stop – 电子元器件、半导体的销售网站
Menu
China
Change
中文
SELECT YOUR LANGUAGE
人民币
SELECT YOUR CURRENCY FOR DISPLAY
关于优惠等级和折扣率

目前的商品价格将适用于以下


・根据顾客的购买情况可以享受优惠和折扣
・关于折扣仅限于从本网站直接下单的订单
・部分产品和阶梯数量不被包含在优惠折扣产品中
・关于优惠等级的详细信息请联系您的销售人员
・不能与其它优惠同时使用

PCN/PDN/NRND信息

PCN(产品/工艺变更通知)和PDN(生产中断通知)信息。

通知日期 通知文书 通知类型 通知信息
2021/06/01 PCN(产品规格变更通知) Module date codes have been migrated from their current 5-digit date code to a 6-digit date code format. The date-code
format will be updated on the individual module laser marking, the individual unit labeling, and the shipping
documentation. Six-digit (6-digit) date code will follow the following format: HAYYWW, where the first two characters
(HA) are internal identifiers, YY (the third and fourth characters) represent the year, and WW (the fifth and sixth
characters) represent the week.
2021/11/11 PCN(产品规格变更通知) Module Label Change on the FM3 Platform
Description of the Change
Module in the FM3 platform will be updated with Wolfspeed Wolfpack(T).
The new laser marking defines
(1) information placement,
(2) addition of the product naming WOLFSPEED WOLFPACK, and
(3) enlargement of the part number and SN across the whole bottom of the text area
Effective Date: 11/11/21
2022/07/01 PCN(产品规格变更通知) Manufacturing of Power Modules on 200-mm Wafers at the Mohawk Valley Fabrication (MVF) Facility

Description of the Change
Wolfspeed’s silicon carbide (SiC) power modules are currently manufactured on 150-mm wafers at Wolfspeed’s
fabrication facilities in RTP and Durham, North Carolina, USA.
To increase its production capacity,
Wolfspeed will utilize its state-of-the art 200-mm wafer Mohawk Valley Fabrication (MVF) facility in New York.

Estimated Key PCN Dates.
Volume Production Date Beginning July 2022
2025/03/28 PCN(产品规格变更通知) Align test and datasheet limits across all gen3 1200V Wolfpack modules
请点击这里进行最后的购买咨询
PCN/PDN/NRND信息
通知类型
通知信息
通知日期
通知产品
制造商 制造商零件编号 最后购买时间 后继产品

通知产品的产品信息

   123  最后  下1页
相关结果:70 件中 / 1~25现在显示






   123  最后  下1页
相关结果:70 件中 / 1~25现在显示