2021/11/01 |
|
PCN(产品规格变更通知)
|
Power Modules Transition to 150-mm Wafer Manufacturing at Wolfspeed’s Durham (DUR) Facility Note that the current 5th generation (CPW5) Schottky diodes will be replaced with the 6th generation (CPW6) Proposed First Ship Date : listed |
2022/07/01 |
|
PCN(产品规格变更通知)
|
Manufacturing of Power Modules on 200-mm Wafers at the Mohawk Valley Fabrication (MVF) Facility
Description of the Change Wolfspeed’s silicon carbide (SiC) power modules are currently manufactured on 150-mm wafers at Wolfspeed’s fabrication facilities in RTP and Durham, North Carolina, USA. To increase its production capacity, Wolfspeed will utilize its state-of-the art 200-mm wafer Mohawk Valley Fabrication (MVF) facility in New York.
Estimated Key PCN Dates. Volume Production Date Beginning July 2022 |
2023/11/17 |
|
PCN(产品规格变更通知)
|
Manufacturing of Power Modules on 200-mm Wafers at the Mohawk Valley~Fabrication (MVF) Facility |
2024/09/12 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:PCN-00136 Title: Updates to Certificate of Compliance for All Wolfspeed Shipments
Description of the Change: This informational notification is to inform Wolfspeed’s customers of updates to certificate of compliance for all Wolfspeed shipments. Updates to be executed are listed below. 1. Add Wolfspeed Delivery Number and Code 128 barcode to header. 2. Add Customer Part number and Code 128 barcode to header. 3. Add “Certificate Issue” to current date line. 4. Update paragraph and wording at the end of the document. 5. Update signature block. |
2025/03/28 |
|
PCN(产品规格变更通知)
|
Align test and datasheet limits across all gen3 1200V Wolfpack modules
|