2022/03/17 |
|
PCN(产品规格变更通知)
|
Labeling Change DESCRIPTION AND PURPOSE OF CHANGE: In line with the corporate design change, Würth Elektronik will update the WE logo on the Standard Label and Mini Label. In addition, Würth Elektronik will also update the RoHS and REACH Logo on the Standard Label. There will be no change of the information and dimensions on the label. Effective Date: March 17, 2022 |
2024/02/21 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:PCN_UtLAN_20240411_20240412 Title: Statement_Delivery prior to PCN Effective Date (PCN_UtLAN_20240412 and PCN_UtLAN_20240411)
Description: we sent out PCN (PCN_UtLAN_20240412[PP0000733786]and PCN_UtLAN_20240411[PP0000733737]) to our customers on 11th and 12th January 2024 with Effective Date April 11, 2024 due to a change to another existing production line. There is a possibility that new products can be delivered before the effective date and specifications stated in the aforementioned PCN. Delivery on an earlier date will be checked on a case-by-case basis with reference to existing delivery dates and demands. If we do not receive an objection from you within 5 working days of receipt of this letter, we will assume consent that you are willing to accept PCN products prior to the PCN effective date. |
2024/04/12 |
|
PCN(产品规格变更通知)
|
Due to external influences, Würth Elektronik will change to another existing production line to manufacture following parts, the design and process will be changed along. Additional Würth Elektronik will change to a new data sheet format and correct datasheet mismatches.
There will be no change in fit, function, quality or reliability of the product. |
2024/08/29 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:PCN_UtLAN_20240829 Title: Würth Elektronik eiSos will change the solder material from Sn99.7Ag0.3 to Sn97Ag3.
Description of Change: In order to enhance the product reliability, Würth Elektronik eiSos will change the solder material from Sn99.7Ag0.3 to Sn97Ag3. There will be no change in form, fit, function, quality or reliability of the product.
Before Change/Sn99.7Ag0.3 After Change/Sn97Ag3
Effective Date: 2024-08-29 (YYYY-MM-DD) |